Case Studies
APLNG Phase #1 Lighthouse and Waikola Dewatering Stations
Project: APLNG Phase #1 Lighthouse and Waikola Dewatering Stations
Client:
Location: Lighthouse and Waikola
Duration: 6 Months
LTI/ MTI: 0
Recordable Incidents: 0
Scope of Work:
The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the I&E Installation of Lighthouse and Waikola Water Gathering Stations.
Project Activities:
- Civil Works associated with Earth Grid Installation
- Cable Tray Design and Installation
- Power and Instrumentation Cabling Installation
- Instrument and Equipment Terminations
- Plant Lighting and Power Design and Installation
- Communication Tower and Cabling Installation
- Connection of Plant Generators
- Instrument Air Tubing Design and Installation
- Construction and Installation of Cable Tray and Pipe Supports
- Structural Grouting
- Testing and Verification
- Hazardous Area Compliance Inspections
- Quality Assurance Development including FICs, HA Checksheets and ITPs
- Procurement and Logistics
- Supply and maintain “as built” drawings and MDR
- Project Management and Project Liaison with Client Representatives
- Development and maintenance of Management Plans
- Commissioning of Installation