Case Studies

APLNG Phase #1 Lighthouse and Waikola Dewatering Stations

Project:                                                APLNG Phase #1 Lighthouse and Waikola Dewatering Stations

Client:                                                                  

                                

Location:                                              Lighthouse and Waikola

Duration:                                             6 Months

LTI/ MTI:                                              0

Recordable Incidents:                    0

Scope of Work:

The supply of materials, labour, equipment, consumables, plant and transport for construction, quality assurance requirements and associated documentation for the completion of the I&E Installation of Lighthouse and Waikola Water Gathering Stations.

Project Activities:                                            

  • Civil Works associated with Earth Grid Installation
  • Cable Tray Design and Installation
  • Power and Instrumentation Cabling Installation
  • Instrument and Equipment Terminations
  • Plant Lighting and Power Design and Installation
  • Communication Tower and Cabling Installation
  • Connection of Plant Generators
  • Instrument Air Tubing Design and Installation
  • Construction and Installation of Cable Tray and Pipe Supports
  • Structural Grouting
  • Testing and Verification
  • Hazardous Area Compliance Inspections
  • Quality Assurance Development including FICs, HA Checksheets and ITPs
  • Procurement and Logistics
  • Supply and maintain “as built” drawings and MDR
  • Project Management and Project Liaison with Client Representatives
  • Development and maintenance of Management Plans
  • Commissioning of Installation