Case Studies

Talinga Suction Header Auto Drains

Project:                                                Talinga Suction Header Auto Drains

Client:                  

Location:                                              Talinga

Duration:                                             1 Month

LTI/ MTI:                                              0

Recordable Incidents:                    0           

Aim of Project:

To install level control and actuated valves on the Reciprocating Compressor drip legs to allow automatic draining and to remove the requirement for twice daily manual draining.

Scope of Work:  

The supply of materials, labour, equipment, consumables, plant and transport, construction, testing, quality assurance (QA) requirements and associated documentation for the completion of 3 auto drains at Talinga Gas Plant.

 

Project Activities:                                            

  • Site Development and associated civil works,
  • Supply, manufacture and installation of all pipes and fittings
  • Supply, manufacture and installation of structural steel
  • Scheduling and co-ordination of both the off-site fabrication and on-site installation
  • Supply and installation of Hazardous Area electrical cable, glands &cable trays
  • Installation and Termination of Instruments
  • Supply & Installation of Structural Grout
  • Supply and application of surface treatments
  • Polyethylene Welding
  • Hydrostatic test of installation
  • Procurement and Logistics
  • Supply and maintain full quality records, “as built” drawings and MDR
  • Installation Traceability Documentation
  • Project Management and Project Liaison with Client Representatives
  • Development and maintenance of Management Plans
  • Commissioning of Installation